Water & sewer infrastructure

Sewer reticulation, septic tanks and soakaways, stormwater drainage, water tanks and external plumbing.

Builder in a hard hat and high-visibility jacket laying blockwork

Overview

Below ground, before everything

Drainage and reticulation are installed early and buried. Getting them wrong is the most expensive class of defect on a building contract, because correcting it means opening ground that has already been built over.

Teljoy Construction delivers sewer reticulation and manholes, septic tanks and soakaways, wastewater and stormwater drainage, water tank installations and reticulation, and external plumbing infrastructure as part of the main contract rather than handing them to a separate trade.

Typical clients & projects

  • Site development
  • Institutions
  • Estates
  • Rural facilities

Scope of work

Water & sewer infrastructure

  1. Sewer reticulation and manholes
  2. Septic tanks and soakaways
  3. Wastewater and stormwater drainage
  4. Water tank installations and reticulation
  5. External plumbing infrastructure

Below ground, before everything

Correcting buried services means opening ground that has already been built over, which is why they are delivered within the main contract and its inspection programme.

How it is delivered

Planned, inspected and handed over with records.

Every water & sewer contract follows the same controlled five-stage process, with a project manager or site agent as your single point of contact on site.

How we work
  1. Drawings being marked up with a scale rule

    Stage 01: Pre-construction

    Review drawings and specifications, confirm scope, programme the works, and plan labour, resources, safety and site establishment.

    Records you receive

    • Construction programme
    • Bills of Quantities
    • Confirmed scope
  2. Pallets of clay bricks delivered to site

    Stage 02: Procurement

    Schedule materials to the programme; manage requisitions, supplier comparisons, approvals, delivery records and material issue control.

    Records you receive

    • Procurement schedules
    • Material schedules
    • Procurement registers
  3. Site team reviewing progress on a building under construction

    Stage 03: Construction

    Coordinate site teams, subcontractors and trades while monitoring progress against drawings, specifications, programme, quality and cost.

    Records you receive

    • Daily site reports
    • Weekly progress reports
    • Progress photographs
    • Variation register
  4. Worker checking alignment along a timber batten

    Stage 04: Quality control

    Inspect foundations, concrete, structure, roofing, services and finishes; maintain inspection records, snag registers and corrective actions.

    Records you receive

    • Inspection and Test Plans
    • Inspection records
    • Snag register
  5. Completed residential building with timber-clad balconies

    Stage 05: Completion & handover

    Complete snagging and quality inspections, then issue practical completion, warranties, as-built information and final handover records.

    Records you receive

    • Practical Completion Certificate
    • As-built information
    • Material warranties
    • O&M information

FAQ

Water & sewer: common questions

Do you install septic tanks and soakaways?

Yes, along with sewer reticulation and manholes, wastewater and stormwater drainage, water tank installations and reticulation, and external plumbing infrastructure.

Why include water and sewer works in the main building contract?

Below-ground services are installed early and built over. Delivering them within the main contract keeps them sequenced and inspected with the rest of the works, avoiding gaps between trades.