IBR and Chromadek roof coverings on steel, lipped-channel or timber structures, with insulation and rainwater goods.

Tower crane beside a concrete-framed building under construction

Overview

Roof structures and coverings that stay watertight

Teljoy Construction builds and refurbishes roofs as part of new buildings and existing ones: steel, lipped-channel and timber roof structures, IBR and Chromadek coverings, fascia, barge boards and ridge capping, insulation and Alububble installation, and gutters and downpipes.

Roofing is inspected like any other element of the building. Roof structures and coverings are checked progressively as the work proceeds, so problems are corrected during construction rather than discovered after handover.

Typical clients & projects

  • New buildings
  • Re-roofing
  • Warehouses
  • Institutions

Scope of work

Roofing works

  1. IBR and Chromadek roofing
  2. Steel, lipped-channel and timber structures
  3. Fascia, barge boards and ridge capping
  4. Insulation and Alububble installation
  5. Gutters and downpipes

Progressive inspection

Roofing is part of the quality-control programme alongside foundations, concrete, structure, services and finishes.

How it is delivered

Planned, inspected and handed over with records.

Every roofing contract follows the same controlled five-stage process, with a project manager or site agent as your single point of contact on site.

How we work
  1. Drawings being marked up with a scale rule

    Stage 01: Pre-construction

    Review drawings and specifications, confirm scope, programme the works, and plan labour, resources, safety and site establishment.

    Records you receive

    • Construction programme
    • Bills of Quantities
    • Confirmed scope
  2. Pallets of clay bricks delivered to site

    Stage 02: Procurement

    Schedule materials to the programme; manage requisitions, supplier comparisons, approvals, delivery records and material issue control.

    Records you receive

    • Procurement schedules
    • Material schedules
    • Procurement registers
  3. Site team reviewing progress on a building under construction

    Stage 03: Construction

    Coordinate site teams, subcontractors and trades while monitoring progress against drawings, specifications, programme, quality and cost.

    Records you receive

    • Daily site reports
    • Weekly progress reports
    • Progress photographs
    • Variation register
  4. Worker checking alignment along a timber batten

    Stage 04: Quality control

    Inspect foundations, concrete, structure, roofing, services and finishes; maintain inspection records, snag registers and corrective actions.

    Records you receive

    • Inspection and Test Plans
    • Inspection records
    • Snag register
  5. Completed residential building with timber-clad balconies

    Stage 05: Completion & handover

    Complete snagging and quality inspections, then issue practical completion, warranties, as-built information and final handover records.

    Records you receive

    • Practical Completion Certificate
    • As-built information
    • Material warranties
    • O&M information

FAQ

Roofing: common questions

What roofing systems do you install?

IBR and Chromadek sheeting on steel, lipped-channel or timber roof structures, with fascia, barge boards, ridge capping, insulation including Alububble, and gutters and downpipes.

Do you replace or refurbish existing roofs?

Yes. Ceiling and roofing refurbishment is part of Teljoy’s renovation work, as well as new roofs on buildings it constructs.

Can roofing be done as a standalone contract?

Roofing can be scoped on its own or as part of a wider building contract. Describe the roof, its size and location in your enquiry.

Planning roofing work?

Share the location, a short description of the work and your preferred start date. Drawings and a bill of quantities help, but aren’t needed to start the conversation.