Institutional · Nyanga, Zimbabwe
Nyanga Border Camp
Accommodation blocks, ablutions, covered laundry facilities and water storage built from excavation and foundations through masonry, roof framing, render and interior finishes, with several work fronts running at once.
- Location
- Nyanga, Zimbabwe
- Sector
- Institutional
The project
Nyanga Border Camp is a multi-front site: several buildings at different stages, with foundations, masonry, roofing and finishes all moving at once. Teljoy delivered it as a single programme, from the first excavation to the finished interiors and night-time lighting.
Foundations and services
The ground at Nyanga is rocky, and the record shows crews breaking out deep excavations for the septic tank and soakaway, alongside foundation trenches for the blocks. Drainage pipework was laid in open trenches between the buildings, and two-compartment chambers were rendered in place.
Structure and roofing
Long face-brick and rendered blocks rose from low-level footprints to gable ends, worked from temporary platforms. Steel trusses were then installed over the blocks and over an open-sided covered facility, followed by sheet roofing.
Finishes
The accommodation blocks are finished with painted external walls, dark-framed windows and a dark plinth. Inside, tiled floors, painted walls, white doors, curtains and recessed lighting run along long open-plan rooms and corridors. The ablution blocks have tiled wet areas, shower cubicles, WCs, urinals and pedestal basins.
Water, laundry and lighting
Water tanks stand on a raised concrete base behind mesh fencing. A covered laundry area has long work surfaces and wash troughs, and external lighting extends along the blocks and the covered facilities.
Gallery
On site
Planning a similar project?
Building, civil works, renovations, institutional projects or infrastructure: tell us what you are planning, where, and when you would like to start.